Certified Erosion, Sediment, & StormWater Inspectors (CESSWI) Practice Test 2025 – Complete Exam Prep

Question: 1 / 450

What does design flood refer to in floodplain management?

Peak discharge associated with a selected probability of exceedance

The concept of design flood is integral to floodplain management as it pertains to the peak discharge of water that is likely to occur within a specified timeframe — often represented by a probability of exceedance. This means that engineers and planners determine the design flood based on statistical analyses of historical flood data to identify the likelihood of a flood event happening in a given timeframe. This information is critical for creating effective flood mitigation strategies, floodplain zoning regulations, and designing infrastructure that must withstand potential flood conditions.

By using the peak discharge associated with a selected probability of exceedance, planners can make informed decisions about how to manage flood risks, ensuring that structures and communities are built or reinforced to handle expected flood events. This targeted approach is essential for reducing damage and increasing safety during severe flooding scenarios.

In contrast, other options do not convey the risk assessment associated with the design flood. Average annual rainfall, standard water levels for drainage, and historical flood elevations, while important in floodplain management, do not directly relate to the probabilistic nature of design flood standards.

Get further explanation with Examzify DeepDiveBeta

Annual average rainfall in a specific area

Standard water level for drainage systems

Elevation of the highest recorded flood event